On this you need to fill in 5 6 inches of gravel and an additional 3 4 inches of concrete floor.
Lower basement floor 6 inches.
For me as a taller fella walking around in the basement now felt like a totally different experience.
These r values are a sum meaning this should be the total r value once you add up the entire depth of insulation.
For example if you want to lower your basement floor 6 inches you ll want to dig at least 14 to 16 inches.
Login or register to continue reading advertisement.
This is where underpining comes in play.
For example if you have a type of insulation that has an r value of r 5 per inch of thickness you will need a depth of 6 inches of this insulation installed in your attic to reach r 30 if you live in zones 2 or 3.
I dug out the dirt with a pick shovel.
My concrete basement floor is about 6 6 below the 1st floor joists.
Can anyone offer advice on cost about 700 sq feet worth process and preparation.
On a recent project we lowered the basement floor by 15 inches bringing the ceiling height from a marginal 6 feet 8 inches to a full 8 feet.
I don t expect to be able to do this myself.
The costs to lower a basement floor can greatly vary as there are so many variables involved including your geographical location the contractor you choose the size of your job the complexity of the work the pipes beneath the flooring that needs to be removed how the floor is going to be lowered your home s condition and so much more.
This is the start to finish video of my basement dig out.
We d like to finish the basement but realize we ll need to lower the floor to meet code and make the space comfortable.
I would like to dig out the 1 foot to 2 feet of the basement floor to achieve ceiling heights of around 7 6 to 8 6 to make to the basement a usable dwelling unit.
Make sure you.
The difference was huge it felt like at least a foot of difference even after the concrete went back in.
I going to be purchasing a semi detached corner unit home in dc that was built in 1923 and has about 900 square feet of basement that current has about 6 7 ceilings.
Always remember though that you should dig at least 8 to 10 inches deeper than where you want your finished floor to be.
However if you need to lower your basement floor more than a couple of inches things get a little complicated.
I started this project in 2012 and finished in late 2017.
Once you have dug as deep as you need you re then going to lay down about 5 inches of gravel.