Spread the compound out evenly.
Level a basement floor with a drain for tile.
Unlike in new construction in which a concrete contractor would simply design the floor with a gentle slope toward the drain existing basement floors are typically made to be level in other.
A minimum of 12 inches of coarse aggregate should be placed around the drain tile.
Then vacuum the floor with a wet dry vac or sweep it with a broom.
The surrounding floor around the drain slopes inwards to help funnel any water from on top of the floor to go in the drain to be removed.
Make a final check with the level to be sure all the high and low spots are gone.
Drain tile can be placed beside or on top of the footing.
Level drain pipe installations are satisfactory.
When should drain tile be installed.
To level a basement floor start by removing any furniture and appliances on it and then thoroughly cleaning it.
By placing the pipe alongside the footing you lower the water table below your basement floor another 6 8 inches.
Cover floor drains with a plastic pipe the same diameter of the drain about inch high.
How to install floor levelling compound on a concrete floor justdoityourself lovingit perfecteverytime subscribe now and hit the bell to get notified ab.
Free draining membrane or board.
Drain tile pipes work best when placed alongside a foundation footing instead of on top of the footing.
Pour the mixed self leveling compound across the surface of the concrete.
With small tiles the maximum differential between the lowest and highest point on the floor is 1 4 inch per 10 feet.
How to level a floor for installing tile before you install file flooring follow the directions above for fixing high spots and low spots in a wood or concrete subfloor.
In new construction install the drain tile immediately after the footing forms are removed.
Use a squeegee or trowel to spread the self leveling agent around until the whole floor is covered.
Then mix a self leveling agent with water in a large bucket and pour it over the surface of the floor.